Q

How many days you need to install the equipment?

A

The installation timeframe varies depending on the specific model and quantity of the equipment. Generally, a single set of small-sized condensing units takes about 3 days. For large-scale refrigeration systems, the installation cycle can range from 1 to 3 months, or even longer for complex projects. We provide both on-site installation services and remote technical guidance.

Q

How many staff abroad you sent to install the equipment?

A

The number of overseas installation personnel depends on the project scale. For small-sized equipment, a team of 2 to 3 people is usually assigned, while large-scale projects may require a dozen or more. Alternatively, we can deploy a core team of key technicians and professional installers to work with local labor for the installation. In this case, the number of personnel dispatched from our side will be significantly reduced.

Q

Can I transfer the money to you then you pay to other supplier?

A

A refrigeration system involves a vast array of equipment, valves, and materials. We provide professional design and component selection, sourcing everything from reliable specialized suppliers to ensure a complete delivery. For your convenience, you can consolidate the total payment to us, and we will manage the procurement and settlements with all sub-suppliers on your behalf.

Q

Can I delivery the goods from other supplier to your factory? Then load together?

A

Certainly. You are welcome to arrange the delivery of your own purchased goods to our factory. We can then consolidate them with our equipment into a single container for shipment.

Q

When will you leave your factory and to have your spring festival holidays?

A

Our office will be closed for a 7-day holiday during the Spring Festival, in accordance with China's official public holiday schedule.

Q

Can the equipment be installed under hot weather?

A

Our equipment is designed to be installed and operate reliably in both extreme heat and cold, as various climatic conditions are fully integrated into our engineering. However, installation progress may be affected in the event of extreme natural disasters or weather conditions where safe construction is not possible.

Q

Can Your products be installed under the cold weather?

A

Our equipment is designed to be installed and operate reliably in both extreme heat and cold, as various climatic conditions are fully integrated into our engineering. However, installation progress may be affected in the event of extreme natural disasters or weather conditions where safe construction is not possible.

Q

Do You have office in shanghai or guangzhou that i can visit?

A

We do not have offices in Shanghai or Beijing. Our primary office and operations in China are located in Qingdao, Shandong Province.

Q

Can you send your staff to install the equipment for us?

A

We offer two options for your project: we can either dispatch a full construction team to handle the entire installation, or send technical supervisors to guide your local workers through the process.

Q

Can I only buy some spare parts from you?

A

You are welcome to purchase individual spare parts or components from us. Regardless of the order quantity, we are committed to providing you with our best service.

Q

Will you will attend the fair to show your products?

A

We regularly participate in industry exhibitions across different regions and will post announcements in advance. You are cordially invited to visit our booth and explore our latest cooling solutions.

Q

Can you send your equipment to my warehouse in guangzhou?

A

No problem. We can arrange for the equipment to be shipped to any designated location of your choice.

Q

How long it takes you to provide the designing options for us?

A

The turnaround time for design proposals and quotations varies depending on the scale of the refrigeration equipment and systems. For simple, small-sized systems, it typically takes 2 to 3 days, while complex, large-scale systems may require 7 to 10 days.

Q

What is your products standardization?

A

Our equipment is manufactured according to Chinese national standards, international standards, or the specific standards of the customer's country. We follow a 'highest standard' policy—whichever standard is more stringent, that is the one we will adhere to.

Q

How do you pack the equipment?

A

Our equipment is packed using pallets, strapping bands, protective film, and cartons. Should you have any specific packaging requirements, please let us know.

Q

Can you can design the equipment according to our size?

A

Our equipment is professionally custom-engineered based on a comprehensive analysis of your site conditions, cold room dimensions, temperature requirements, and cooling capacity. We also take into account critical factors such as freezing time, product types, and daily throughput to ensure the final design perfectly aligns with your operational needs.

Q

How many years have your company made this kind of equipment?

A

Established in 2013, our company has a history of over a decade. We have built a proven track record serving hundreds of clients across diverse industries, including food processing, cold chain logistics, pharmaceuticals, and chemical engineering.

Q

Which certificate do you have for your equipment?

A

Our company is ISO 9000 certified and holds professional qualifications for Electromechanical Equipment Installation, as well as specialized licenses for Pressure Pipeline Design and Construction. With over 20 invention patents, we are a comprehensive enterprise integrating professional design, manufacturing, and construction (Turnkey solutions).

Q

How many staffs do you have in your factory?

A

Our company boasts a workforce of over 100 employees, including a multidisciplinary team of sales professionals, design engineers, and construction specialists.

Q

How far is your factory from the airport?

A

Our factory is about a two-hour drive from the airport. We warmly welcome you to visit us for an inspection, and we will handle all the pickup and drop-off arrangements for you.

Q

Where is your factory located?

A

Our main office is located in Qingdao, Shandong Province, and our manufacturing facility is based in Binzhou, Shandong. We warmly welcome you to visit us for an on-site inspection.

Q

Do you provide free spare parts ?

A

"To ensure the stable operation of the equipment, we provide a set of free wear parts. This allows you to perform quick replacements yourself in the event of any component failure, minimizing potential downtime.

Q

Do you have detailed and professional installation manual?

A

Our equipment comes with comprehensive installation manuals and operation instructions. Additionally, we provide both on-site installation services and technical guidance to support your project.

Q

What is your MOQ?

A

"We have no Minimum Order Quantity (MOQ) requirements; we are happy to supply even a single unit. We welcome your inquiries and look forward to your orders.

Q

Are you a trading company or a manufacturer?

A

We are an integrated enterprise combining design, manufacturing, trade, and construction. We provide a full-lifecycle service, covering everything from customized engineering design and one-stop procurement to final installation, commissioning, and system startup.

Q

How long is your delivery time?

A

The production lead time varies depending on the product type. Generally, it takes about 3 weeks for condensing units, 2 weeks for air coolers and condensers, and 1 to 2 weeks for insulation panels, depending on the order quantity.